What is the primary focus of CDM 2015 guidance?

Take your CIOB EPA Level 4 Design and Construction Management Test preparation to the next level. Practice with tailored quizzes, detailed explanations, and insightful hints. Prepare confidently for your upcoming assessment!

Multiple Choice

What is the primary focus of CDM 2015 guidance?

Explanation:
The main idea behind CDM 2015 is health and safety management across a construction project. It provides a framework to identify and control risks from the earliest design stages through construction and into use, by clarifying roles (client, designers, principal designer, principal contractor) and requiring clear planning and information so hazards are mitigated before work starts. While safer design and planning can influence aspects like quality or cost, the primary aim is to prevent accidents and ill health on site, not to drive design quality, profitability, or high-rise performance.

The main idea behind CDM 2015 is health and safety management across a construction project. It provides a framework to identify and control risks from the earliest design stages through construction and into use, by clarifying roles (client, designers, principal designer, principal contractor) and requiring clear planning and information so hazards are mitigated before work starts. While safer design and planning can influence aspects like quality or cost, the primary aim is to prevent accidents and ill health on site, not to drive design quality, profitability, or high-rise performance.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy